Samples
ChI_04.jpg
Login Form



Who's Online
We have 3 guests online

PostHeaderIcon Total Dunbar TAD Installation

The Dunbar field, situated 22km south of Alwyn North, first produced oil/gas in 1994. Dunbar comprises a steel jacket platform together with drilling and accommodation facilities. Throughout recent current drilling campaigns, the Transocean Sedco 706 semi-submersible had been anchored alongside Dunbar to provide Tender Assist to the Drilling functions. This project provided an overview and offshore induction to the operations involved in hook-up and hose connections, including installation and operation of the Quick Disconnect couplings.

 

TAD Worksite QDC Connect 

 
Latest News

After a shutdown over the Xmas holidays, Granite Productions is in full working More...
imagesLegA_thumb.jpg
This presentation contains information about the Dunlin A Platform. The More...
I have recently moved all Client Download files to this server, available from More...
imagesSwivelStack_thumb.jpg
This work comprised an engineering study investigating the operational issues More...
imagesTADWorksite_thumb.jpg
The Dunbar field, situated 22km south of Alwyn North, first produced oil/gas More...
imagesWorksiteViewsBravo_thumb.jpg
This presentation describes the replacement and bypass of the Cell More...
imagesStarlingIntroduction_thumb.jpg
The Starling well fluids are brought onboard Shearwater 'A' Platform through a More...
imagesSystemCapability_thumb.jpg
The Simian/Sienna and Sapphire Fields are located off the coast of Egypt in the More...
Samples
Att_05.jpg