Samples
BF_03.jpg
Login Form



Who's Online
We have 3 guests online

PostHeaderIcon Brent Bravo Cell Fill Manifold

This presentation describes the replacement and bypass of the Cell Import/Export Manifolds and 10" Cell Fill Lines located in the Utility Shaft of the Brent Bravo platform. The construction activity installed a new Import/Export Manifold at EL +87m, above the existing equipment at the Cell Fill Manifold level.

The conversion from existing to replacement Cell Fill Lines required the isolation and removal/replacement of the relevant existing Cell Fill Lines. A general description of the work area and its location was provided, with a brief introduction to the function of the main systems contained within the Utility Leg.

Worksite Views - Bravo Cell Fill - Bravo

 
Latest News

After a shutdown over the Xmas holidays, Granite Productions is in full working More...
imagesLegA_thumb.jpg
This presentation contains information about the Dunlin A Platform. The More...
I have recently moved all Client Download files to this server, available from More...
imagesSwivelStack_thumb.jpg
This work comprised an engineering study investigating the operational issues More...
imagesTADWorksite_thumb.jpg
The Dunbar field, situated 22km south of Alwyn North, first produced oil/gas More...
imagesWorksiteViewsBravo_thumb.jpg
This presentation describes the replacement and bypass of the Cell More...
imagesStarlingIntroduction_thumb.jpg
The Starling well fluids are brought onboard Shearwater 'A' Platform through a More...
imagesSystemCapability_thumb.jpg
The Simian/Sienna and Sapphire Fields are located off the coast of Egypt in the More...
Samples
expr.jpg