Starling Field Development
The Starling well fluids are brought onboard Shearwater 'A' Platform through a new Riser. The well fluids are routed through a new ESD Valve and wet gas meter to tie-in points on the existing Production and Test Separator lines. The Starling facilities were contained in two prefabricated modules located above the existing Scoter Module.
This project included the development of step by step installation procedures for the Starling Equipment and tie-in pipework.
| Next > |
|---|




