
Project Datasheets
The following datasheest contain a summary and selected screenshots from a selection of projects undertaken by Granite Productions over the last few years. Please contact us if you would like further information about any of the project featured here.
DocumentsDate added
![]() |
The purpose of inspection of Brent charlie C4 Leg below the Gas Tight Floor was to prove the integrity of the identified lines. General Visual Inspection was also undertaken on the concrete Cell Structure and the Support Steel Structure. |
![]() |
The objective of the Brent Bravo Minicell Project’s first periodic inspection was to inspect the cell-fill oil lines, ballast water systems and redundant systems in the Minicell and Utilities Shaft below +76m to ensure that their integrity is maintained for the remaining operational life of the platform. This presentation provided an introduction to issues relating to Access and Inspection of the Utility Leg Minicell Structure and Pipework located in the Utility Leg of the Brent Bravo Platform. |
![]() |
This presentation describes the replacement and bypass of the Cell Import/Export Manifolds and 10 Cell Fill Lines located in the Utility Shaft of the Brent Bravo platform. The construction activity installs a new Import/Export Manifold at EL +87m, above the existing equipment at the Cell Fill Manifold level. |
![]() |
High level Visual Communication, Presentation and 3D Visualisation. For Engineering, Marketing, Product Development and Project Support. Collection of Datasheets listed below. |
![]() |
High level Visual Communication, Presentation and 3D Visualisation. For Engineering, Marketing, Product Development and Project Support. |
Granite Production Flysheets - CMYK TIFF 300dpi
![]() |
The NW Seymour field is located in UKCS Block 22/5b in the Central North Sea approximately 250 km to the east of Aberdeen and 2 km east of the Armada platform. SW Seymour is in production by a development well drilled from the Armada latform. NW Seymour will be tied back to and produced from the Armada Platform. |
![]() |
The Miskar Gas Field is located in the Gulf of Gabes 122 km off the coast of Tunisia. The field came on stream in 1996. The produced gas and condensate are produced via a 125 km, 24" pipeline to the Hannibal production facility 21 km south of Sfax. In order to maintain production levels, infill wells were planned for the Miskar Field. Two additional wells were drilled approximately 2.8 km South of the Miskar Platform using subsea completions and tied back to the Miskar A platform via subsea flowlines. A further four wells will be drilled from the Miskar A Drilling & Production Platform. |
![]() |
The Maria field is located in UKCS Block 1629a in the Central North Sea approximately 250 km to the east of Aberdeen and 11 km North-West of the Armada platform. Maria is produced by means of a subsea production tie-back to the Armada platform. Two wells were drilled, one in the Maria Terrace prospect and one in the adjacent Maria Horst prospect with adjacent tophole locations. |
![]() |
The Atlantic and Cromarty Field Development drilled one production gas well at Cromarty and two wells at Atlantic. The fields export gas to St Fergus via an 80km pipeline. |










