Downloads
Samples
gait.jpg
Login Form



Who's Online
We have 3 guests online
Shell,Tern Incremental Project, October 2000
Details for Shell,Tern Incremental Project, October 2000
PropertyValue
NameShell,Tern Incremental Project, October 2000
Description

  The purpose of the Tern Incremental Project (TIP) was to substantially increase the capacities of the Production Water handling and Gas Compression facilities on the Tern Platform.

FilenameTIP.pdf
Filesize1.28 MB
Filetypepdf (Mime Type: application/pdf)
Creatormartin
Created On: 06/10/2008 09:34
ViewersEverybody
Maintained byEditor
Hits1060 Hits
Last updated on 06/10/2008 09:57
Homepage
CRC Checksum
MD5 Checksum
Latest News

polvo.jpg
If you are active in Brazil or looking to establish new markets in the latest more
imagesRochelleFieldSmall_Rev2_thumb.jpg
These images were provided to illustrate the general layout and location of a more
imagesLegA_thumb.jpg
This presentation contains information about the Dunlin A Platform. The more
I have recently moved all Client Download files to this server, available from more
imagesSwivelStack_thumb.jpg
This work comprised an engineering study investigating the operational issues more
imagesTADWorksite_thumb.jpg
The Dunbar field, situated 22km south of Alwyn North, first produced oil/gas more
imagesWorksiteViewsBravo_thumb.jpg
This presentation describes the replacement and bypass of the Cell more
imagesStarlingIntroduction_thumb.jpg
The Starling well fluids are brought onboard Shearwater 'A' Platform through a more
The Simian/Sienna and Sapphire Fields are located off the coast of Egypt in the more
Samples
Frig_03.jpg