Downloads
Samples
Captain.jpg
Login Form



Who's Online
We have 4 guests online
Technip, Simian/Sienna and Sapphire, April 2007
Details for Technip, Simian/Sienna and Sapphire, April 2007
PropertyValue
NameTechnip, Simian/Sienna and Sapphire, April 2007
Description

  The Back Up Intervention Control System (BUICS), is Intended to temporarily replace the main Simian/Sienna and Sapphire Field Control System in the event of a total or partial failure of sub-sea umbilicals. There are two BUICS - one designed for the 830m water depth of the Simian/Sienna Field, and one for the 300m water depth of the Sapphire field. Both of these systems are retained on standby and may be mobilised and deployed individually.

FilenameBUICS.pdf
Filesize1.19 MB
Filetypepdf (Mime Type: application/pdf)
Creatormartin
Created On: 06/10/2008 11:43
ViewersEverybody
Maintained byEditor
Hits1316 Hits
Last updated on 06/10/2008 11:45
Homepage
CRC Checksum
MD5 Checksum
Latest News

polvo.jpg
If you are active in Brazil or looking to establish new markets in the latest more
imagesRochelleFieldSmall_Rev2_thumb.jpg
These images were provided to illustrate the general layout and location of a more
imagesLegA_thumb.jpg
This presentation contains information about the Dunlin A Platform. The more
I have recently moved all Client Download files to this server, available from more
imagesSwivelStack_thumb.jpg
This work comprised an engineering study investigating the operational issues more
imagesTADWorksite_thumb.jpg
The Dunbar field, situated 22km south of Alwyn North, first produced oil/gas more
imagesWorksiteViewsBravo_thumb.jpg
This presentation describes the replacement and bypass of the Cell more
imagesStarlingIntroduction_thumb.jpg
The Starling well fluids are brought onboard Shearwater 'A' Platform through a more
The Simian/Sienna and Sapphire Fields are located off the coast of Egypt in the more
Samples
Att_01.jpg