Downloads
Samples
_MJLay.jpg
Login Form



Who's Online
We have 2 guests online
Shell, Starling Field Project, April 2007
Details for Shell, Starling Field Project, April 2007
PropertyValue
NameShell, Starling Field Project, April 2007
Description

  The Starling well fluids are brought onboard Shearwater A Platform through a new Riser. The well fluids are routed through a new ESD Valve and wet gas meter to tie-in points on the existing Production and Test Separator lines. The Starling facilities are contained in two prefabricated modules located above the existing Scoter Module.

FilenameStarling.pdf
Filesize1.24 MB
Filetypepdf (Mime Type: application/pdf)
Creatormartin
Created On: 06/10/2008 11:45
ViewersEverybody
Maintained byEditor
Hits1353 Hits
Last updated on 06/10/2008 11:47
Homepage
CRC Checksum
MD5 Checksum
Latest News

polvo.jpg
If you are active in Brazil or looking to establish new markets in the latest more
imagesRochelleFieldSmall_Rev2_thumb.jpg
These images were provided to illustrate the general layout and location of a more
imagesLegA_thumb.jpg
This presentation contains information about the Dunlin A Platform. The more
I have recently moved all Client Download files to this server, available from more
imagesSwivelStack_thumb.jpg
This work comprised an engineering study investigating the operational issues more
imagesTADWorksite_thumb.jpg
The Dunbar field, situated 22km south of Alwyn North, first produced oil/gas more
imagesWorksiteViewsBravo_thumb.jpg
This presentation describes the replacement and bypass of the Cell more
imagesStarlingIntroduction_thumb.jpg
The Starling well fluids are brought onboard Shearwater 'A' Platform through a more
The Simian/Sienna and Sapphire Fields are located off the coast of Egypt in the more
Samples
Captain.jpg