| Name | Shell, Starling Field Project, April 2007 |
| Description |
 |
The Starling well fluids are brought onboard Shearwater A Platform through a new Riser. The well fluids are routed through a new ESD Valve and wet gas meter to tie-in points on the existing Production and Test Separator lines. The Starling facilities are contained in two prefabricated modules located above the existing Scoter Module. |
|
| Filename | Starling.pdf |
| Filesize | 1.24 MB |
| Filetype | pdf (Mime Type: application/pdf) |
| Creator | martin |
| Created On: |
06/10/2008 11:45 |
| Viewers | Everybody |
| Maintained by | Editor |
| Hits | 1353 Hits |
| Last updated on |
06/10/2008 11:47 |
| Homepage | |
| CRC Checksum | |
| MD5 Checksum | |