Downloads
Samples
BF_04.jpg
Login Form



Who's Online
We have 3 guests online
Total, Dunbar TAD Installation, November 2007
Details for Total, Dunbar TAD Installation, November 2007
PropertyValue
NameTotal, Dunbar TAD Installation, November 2007
Description

  The Dunbar field, situated 22km south of Alwyn North, first produced oil/gas in 1994. Dunbar comprises a steel jacket platform together with drilling and accommodation facilities. Produced oil, gas and water is pumped back to the Alwyn platform via a 22km subsea multiphase pipeline. Throughout recent current drilling campaigns, the Transocean Sedco 706 semi-submersible has been anchored alongside Dunbar to provide Tender support services.

FilenameDunbar_TAD.pdf
Filesize1.18 MB
Filetypepdf (Mime Type: application/pdf)
Creatormartin
Created On: 06/10/2008 11:51
ViewersEverybody
Maintained byEditor
Hits1308 Hits
Last updated on 06/10/2008 11:53
Homepage
CRC Checksum
MD5 Checksum
Latest News

polvo.jpg
If you are active in Brazil or looking to establish new markets in the latest more
imagesRochelleFieldSmall_Rev2_thumb.jpg
These images were provided to illustrate the general layout and location of a more
imagesLegA_thumb.jpg
This presentation contains information about the Dunlin A Platform. The more
I have recently moved all Client Download files to this server, available from more
imagesSwivelStack_thumb.jpg
This work comprised an engineering study investigating the operational issues more
imagesTADWorksite_thumb.jpg
The Dunbar field, situated 22km south of Alwyn North, first produced oil/gas more
imagesWorksiteViewsBravo_thumb.jpg
This presentation describes the replacement and bypass of the Cell more
imagesStarlingIntroduction_thumb.jpg
The Starling well fluids are brought onboard Shearwater 'A' Platform through a more
The Simian/Sienna and Sapphire Fields are located off the coast of Egypt in the more
Samples
tecn.jpg